Racing NSW advise due to significant rainfall following the running of race 5 at Muswellbrook a track inspection took place and a decision was made to run race 6 with a downgrade to the track rating.
Following the running of that race, all riders expressed concerns with visibility and the footing of the surface therefore race 7 has been postponed.